1. Home
  2. RV Roofing
  3. TPO RV Roofing
  4. Class A Customs TPO 8.5 Foot Wide - Membrane Only
Class A Customs TPO 8.5 Foot Wide - Membrane Only
Class A Customs TPO 8.5 Foot Wide - Membrane Only

Class A Customs TPO 8.5 Foot Wide - Membrane Only

0 Review(s) Write a Review
Your Price: $10.99
Class A Customs TPO 8.5 Foot Wide - Membrane Only
Part Number: TPO-RO-85
Availability: In Stock. 100 Free Shipping.

Choose Options

*

Membrane Ships Folded  Depending on size of kit you will get one or two boxes (glue / membrane)

Membrane Length / Width It is recommended to get a length that is longer / wider than your unit due to possible curve of the roof, raised or lowered areas, removing the excess is much better than not having enough.

Membrane 8.5 foot wide x length selected


Installation Help

TPO Membrane
Single-ply membrane, lighter weight than EPDM
COLOR White - Color is same throughout substrate, can be applied either side
Will not chalk, fade, or leave streaks down the side of your RV
Brilliant UV performance and is resistant to mold, algae, and fungus
THICKNESS 32mils
Better puncture resistance than EPDM at .028 Thick
Will not shrink or crack (100% solids sealant)
Stretches easier so you can get a perfect, tight fit
Can be easily repaired.


Warning: Cancer and reproductive harm. www.P65Warnings.ca.gov.


Installation Help 

  1. Route all necessary vent and accessory openings. Sand all wood decking openings, seams and edges to a smooth surface. Blow debris off roof (wood decking) with air hose.
  2. Apply duct tape (2” minimum width) evenly onto roof and sidewall to cover sharp metal or fiberglass edge.
  3. Optional: Apply a porous tape (masking or fiberglass mesh) to seam the decking where butted together. This will help hide decking seams and give the finished roof a smoother appearance while strengthening the joint.
  4. Make sure all screw heads and surface is smooth and level throughout.
  5. Remove membrane from box as soon as possible onto clean roof of unit. Do Not allow membrane to touch ground or dirty surface. Do Not allow membrane to touch sharp objects or surfaces. Membrane can be glued either side down.
  6. Cut the roof sheet to fit roof length with an excess of at least 6” front and rear. Square as required.
  7. “Bed Sheet” the roof. That is, fold it in half so half of the deck is exposed.
  8. Apply adhesive in a wet film thickness of 8-10 mils with a paint roller or brush to the exposed half of the roof deck. (1 gal. will cover approximately 160-200 sq ft.)
  9. Lay the roof membrane over the wet adhesive.
  10. Before removing air pockets with a squeegee (gray neoprene head will not streak), the membrane must be lifted and pulled taut from each of the four corners of the roof. The membrane needs to be adjusted both in width (side to side) and length (front to rear) to ensure the roof is as flat as possible before the squeegee process.
  11. Remove all air pockets with a squeegee; press firmly working from the center outward toward the edges. All wrinkles must be removed at this point for a quality installation. The roof will tighten and conform as the adhesive cures.
  12. Repeat steps 6 through 11 for remaining half of roof. (In mass production situations the entire roof may be glued all at once.)
  13. Using a utility knife “x” cut all roof openings. Make sure you round all 90-degree corners to eliminate the possibility of running cuts. Surplus material can be stapled inside the vent openings. Let surplus material drape over the side of the unit for perimeter finishing. The roof edges can be sharp – it is required that duct tape be used to avoid edge splits.
  14. Apply putty /butyl tape to the backside of the roof-edge molding. Then while holding the bar, draw surplus material tight with a downward pull. Attach the drip edge bar, working outward from the center of the unit. When fully installed, use a utility knife to cut surplus material from below the bar.
  15. Assemble and attach roof molding where the roof membrane meets the front and rear end caps. Remember the roof molding must be secured to a cross member.
  16. Apply putty/butyl tape to all vents and accessories on the roof.
  17. Seal around all vents and accessories. Apply sealant to all visible screw heads. Both edges of the front and rear roof molding must also be sealed. There is no need to spread the sealant as you are applying it. A minimum 3/8” bead will work for most applications.
*Butyl tape provides the “Primary Seal” against water infiltration or penetration in these membrane roof assemblies. The lap sealant is a secondary seal.

* Butyl tape must be compressed 30% to 40% to perform correctly.

Related Items

2 Pack Black Textured Folding Cup Holders
$12.95
(0)
In Stock. Free Shipping.
Heng's Replacement Escape Hatch Latch Spring Loaded
$12.95
(0)
In Stock. Free Shipping.
Under Mount Style Water Tank 25 Gallon
$74.99
(0)
In Stock. Free Shipping.
Under Mount Style Water Tank 20 Gallon
$59.99
(0)
In Stock. Free Shipping.
Black Metal Sand Foot Pad for 2
$15.99
(0)
In Stock. Free Shipping.
12 volt DC Replacement Range Hood Motor by Heng's
$14.49
(0)
This item is currently out of stock and will ship when back in stock. Free Shipping.

Browse Similar Items